Powering through the heat

It was another week in the heat for crews working on Dundas Place! We started off with a water service switch over between Talbot and Richmond. Businesses and residents along this stretch are now hooked up to the modern and reliable system.

We also started to install pole bases between Ridout to Talbot. These will hold the new street light poles which will be unique to Dundas Place and contribute to the simple and playful streetscape.

Hydro duct work was underway on the south side of Dundas, between Talbot to Richmond. This is why the pedestrian crossover has been shifted west, it is in front of Hotel Metro. The crossing is expected to return to its original spot, in front of Fanshawe College, on Monday. The image below shows crews adjusting the pedestrian crosswalks earlier this week.

The image below shows crews pouring concrete for the hydro duct work.

That's all for this week! Below is a summary of work completed and next steps for the week ahead.

Work Completed:

  • Watermain connection work at Talbot

  • Water service switch over between Talbot and Richmond

  • Pole base installation between Ridout and Talbot

  • Ongoing road excavation from Ridout to Talbot

  • Hydro duct work Talbot to Richmond

 

Work Anticipated Next Week:

  • Hydro duct work between Talbot and Richmond

  • Hydro servicing into buildings between Talbot and Richmond

  • Trench drain installation between Ridout to Talbot







 