This week, the crew was hard at work at both ends of the construction zone. You'll notice that we're still underground on one end, as the crew tackles the remaining hydro duct work.

At the other end, the crew continues concrete work in preparation for the brick work. This involves in-depth conversations with paving experts to determine the best possible installation methods to ensure the beauty and durability of our flex street for years to come. 

Perfect Paving Conditions 

 

The block between Ridout and Talbot on Dundas Place has been closed to pedestrians in order to expedite the paving process, and take advantage of ideal paving conditions. While closed, pedestrians are being detoured around the construction zone, onto King and Queen Street. The full sidewalk / road closure is expected to last until the middle of next week.

 

Visit Dundas Place for your chance to win!

 

From September 7 to October 14, our friends at Jack FM are running a Dundas Place scavenger hunt! Visit a participating Dundas Place store or service location to receive special discount offers and for your chance to win $250 in Dundas Dollars and two tickets to any concert at Budweiser Gardens!

 

Want to get involved? Businesses still interested in participating are asked to contact the radio station.

 

Remembering the Dundas Place Arts Festival

 

Dundas Place is about about building a community and creating unique opportunities to connect with people. Check out the Dundas Place Arts Festival recap video produced by our friends at Downtown London below!

Below is a summary of Dundas Place construction for the week of September 3 and next steps for the week ahead.

 

Work Completed:

  • Prepare gravel base for concrete between Ridout/Tabot

  • Trench drain installation between Ridout/Talbot

  • Lay brick between Ridout/Talbot

  • Duct work from mainline to building between Talbot/Richmond

  • Hydro duct work at the west side of Richmond intersection

Work Anticipated Next Week:

  • Continue brick installation along buildings between Ridout/Talbot

  • Continue trench drain installation between Ridout/Talbot

  • Begin concrete work south side of Dundas between Ridout/Talbot

  • Complete Hydro work near the Richmond intersection

  • Resume watermain installation near Richmond intersection